Language
×
ChineseEnglish
  • Home

  • Tolian+

    • Company Introduction
    • Company Culture
    • Company Video
    • Honor
    • History
  • News+

    • News Center
    • Media Focus
    • Notice
  • Products+

    • Bridge Construction
    • Special Transporters
    • Premium Mould
    • Heavy Lifting
    • Tunnel Construction
    • Service
  • Innovation+

    • Capability
    • Patents
    • Cooperation
  • Reference+

    • Applications
    • Partners
  • Contacts+

    • Location
    • Download
  • News Center
  • Media Focus
  • Notice

900t SLC finished the erection of Chang-Gan Line Section 12

Publication Date:2017-08-24

On 24th August, 2017, Tolian 900t Special Launching Carrier sucessfully finished the erection of last piece of 900t concrete box beam of Chang-Gan Highspeed Railwaly Line section 12. Congratulations to the closure of Chang-Gan Railway Line.

 

 

China Railway 21st Bureau Group Co., Ltd. is in charge of the construction of Section 12 of Chang-Gan Railway Line and the total length of this section is 45km. There are 26 tunnels and 531 pieces of box beam. The working condition is very difficult and 21st Bureau found a solution in the 900t Special Launching Carrier of Tolian. The advanced technology saved working time and cost for 21st Bureau tremendously.

 

 

Tolian
  • Company Introduction
  • Company Culture
  • Company Video
  • Honor
  • History
News
  • News Center
  • Notice
Products
  • Bridge Construction
  • Special Transporters
  • Premium Mould
  • Heavy Lifting
  • Tunnel Construction
  • Service
Innovation
  • Capability
  • Patents
  • Cooperation
Reference
  • Applications
  • Partners
Contacts
  • Location
  • Download
 
 

Copyright © Qinhuangdao Tianye Tolian Heavy Industry & Technology Co., Ltd.

备案号:冀ICP备16020782号-1

冀公网安备 13030502000240号

Tel: 0335 - 5302568