Language
×
ChineseEnglish
  • Home

  • Tolian+

    • Company Introduction
    • Company Culture
    • Company Video
    • Honor
    • History
  • News+

    • News Center
    • Media Focus
    • Notice
  • Products+

    • Bridge Construction
    • Special Transporters
    • Premium Mould
    • Heavy Lifting
    • Tunnel Construction
    • Service
  • Innovation+

    • Capability
    • Patents
    • Cooperation
  • Reference+

    • Applications
    • Partners
  • Contacts+

    • Location
    • Download
  • News Center
  • Media Focus
  • Notice

CCTV focus on He-An Highspeed Railway

Publication Date:2017-12-29

On 26th December 2017, the first super bridge of He-an highspeed railway project constructed by China Railway Beijing Enginnering Group Co., Ltd finished erection wiith the last piece of 24m box girder being placed onto the bridge pier.



As the leading bridge construction equipment manufacturer in China, Tolian has always been walking together with the rhythm of construction of China. Tolian products are widely used in the critical projects all over China.



The He-An project site service team from Tolian was recoginazed as "The most beautiful team " because of the safety and efficiency work and excellent achivement.




Tolian
  • Company Introduction
  • Company Culture
  • Company Video
  • Honor
  • History
News
  • News Center
  • Notice
Products
  • Bridge Construction
  • Special Transporters
  • Premium Mould
  • Heavy Lifting
  • Tunnel Construction
  • Service
Innovation
  • Capability
  • Patents
  • Cooperation
Reference
  • Applications
  • Partners
Contacts
  • Location
  • Download
 
 

Copyright © Qinhuangdao Tianye Tolian Heavy Industry & Technology Co., Ltd.

备案号:冀ICP备16020782号-1

冀公网安备 13030502000240号

Tel: 0335 - 5302568